
POWER RATES
POWER ADVISORIES
Pahibalo sa mga katapo-konsumidores nga KANSELADO ang SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila sa ila 50 MVA Transformer #1 sa Panit-an Substation sa MARSO 03, 2024 (DOMINGO). Ang oras kag apektado nga lugar sang sini nga CANCELLED power interruption amo ang masunod: 5:00 AM- 7:00 AM (2 ka Read more
As of 12:30 AM, March 2, 2024 Power was FULLY RESTORED in the entire coverage area of ILECO III. Ajuy S/s Time of Interruption: 6:54 PM, March 1, 2024 Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Time of Interruption: 7:05 PM, March 1, 2024 Feeder 1 – Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substations of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Feeder 1 – ENERGIZED at 11:03 PM Read more
NEWS AND UPDATES
Know how to use a fire extinguisher. Read more
ANO ANG MGA ACCREDITED PAYMENT CENTERS SANG ILECO III? *Para lamang ini sa mga individual Member-Consumer-Owners. Ang BAPA Members ang kinahanglan magbayad sa ila natungdan nga BAPA. Read more
Avoid overnight charging. Read more
Pahibalo sa mga katapo konsumidores sang ILECO III nga may ara sang 5% nga diskwento para sa aton mga Senior Citizens nga naga-konsumo sang indi maglapaw sa 100 kwhr kag nakapa-miyembro na sa kooperatiba indi magnubo sa isa ka tuig.Ipasa ang mga masunod nga requirements sa pinakamalapit nga Area Office sang ILECO III: • Valid Read more
BIDS AND NOTICES
Design and Integration of ILECO III Mobile Application Read more