• KANSELADO ANG SCHEDULED PREVENTIVE MAINTENANCE SANG NGCP SA MARSO 3, 2024

    Pahibalo sa mga katapo-konsumidores nga KANSELADO ang SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila sa ila 50 MVA Transformer #1 sa Panit-an Substation sa MARSO 03, 2024 (DOMINGO). Ang oras kag apektado nga lugar sang sini nga CANCELLED power interruption amo ang masunod: 5:00 AM- 7:00 AM (2 ka Read more

  • POWER RESTORATION UPDATE

    As of 12:30 AM, March 2, 2024 Power was FULLY RESTORED in the entire coverage area of ILECO III. Ajuy S/s Time of Interruption: 6:54 PM, March 1, 2024 Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Time of Interruption: 7:05 PM, March 1, 2024 Feeder 1 – Read more

  • NGCP UNSCHEDULED POWER INTERRUPTION (MARCH 1, 2024 UPDATE as of 11:30 PM)

    With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substations of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Feeder 1 – ENERGIZED at 11:03 PM Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION- Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION- Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa Read more

  • FIRE SAFETY TIP

    Ensure emergency contact information is up-to-date. Read more

  • TYPHOON SAFETY TIPS

    ILECO III’s Typhoon Safety Tips to make you and your family safe! Always be ready, stay alert and be vigilant. A friendly reminders from ILECO III! Read more

  • WEATHER ADVISORY

    PAHIBALO SA TANAN NGA ILECO III MEMBER-CONSUMER-OWNERS Bangud sang gina-antisipar nga pag-sulod sang Bagyong Mawar ukon Betty sa Philippine Area of Responsibility (PAR), gina-abisuhan ang tanan sa possible nga unscheduled power interruptions nga maga-luntad sa franchise coverage sang ILECO III. Para sa pag-report sang mga power interruptions kag iban pa nga impormasyon nahanungod sa electric Read more