• UNSCHEDULED POWER INTERRUPTION (NOVEMBER 11, 2023)

    Date: November 11, 2023 (Saturday) Time of interruption: 6:23 p.m. Estimated time of restoration: 11:00 p.m. Affected area/s: Municipalities of Balasan and Carles, and portion of Estancia Cause of power interruption: Line fault in primary distribution line Our maintenance team is currently troubleshooting the damaged primary distribution line for the power to be restored. We Read more

  • SCHEDULED POWER INTERRUPTION SA NOBYEMBRE 15, 2023

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa NOBYEMBRE 15, 2023 (MIYERKULES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa pag relocate sang Single-Phase Line sa Brgy. Pasayan, Batad. Ang lugar nga apektado sang sini nga power interruption amo ang Brgy. Pasayan, Batad. Madamo gid nga salamat Read more

  • UNSCHEDULED POWER INTERRUPTION (NOVEMBER 9, 2023)

    Date: November 9, 2023 (Thursday) Time of interruption: 7:12 PM Estimated time of restoration: 7:35 PM Affected area/s: Sitio Waling-Waling, Poblacion and Brgy. Barosbos, Carles Activity: Inspection and replaced busted fuse link of Phase C Line. We apologize for the inconvenience. For your information. Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION- Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION- Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa Read more

  • FIRE SAFETY TIP

    Ensure emergency contact information is up-to-date. Read more

  • TYPHOON SAFETY TIPS

    ILECO III’s Typhoon Safety Tips to make you and your family safe! Always be ready, stay alert and be vigilant. A friendly reminders from ILECO III! Read more

  • WEATHER ADVISORY

    PAHIBALO SA TANAN NGA ILECO III MEMBER-CONSUMER-OWNERS Bangud sang gina-antisipar nga pag-sulod sang Bagyong Mawar ukon Betty sa Philippine Area of Responsibility (PAR), gina-abisuhan ang tanan sa possible nga unscheduled power interruptions nga maga-luntad sa franchise coverage sang ILECO III. Para sa pag-report sang mga power interruptions kag iban pa nga impormasyon nahanungod sa electric Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more