• SCHEDULED POWER INTERRUPTION SA HULYO 13, 16 KAG 18, 2022 SA BANWA SANG BALASAN

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa patigayunon nga clearing sang linya kag pag-ilis sang mga guba nga poste. Ang petsa, oras kag lugar nga apektado sang sini nga power interruption sa BALASAN amo ang masunod: Hulyo 13, 2022 (Miyerkules)9:00 AM- 5:00 PM(8 ka oras ang kalawigon) •… Read more

  • EMERGENCY PLANT SHUTDOWN ANG NATIONAL POWER CORPORATION (NPC)- SPUG SA HULYO 10, 2022

    Pahibalo sa mga katapo-konsumidores nga may EMERGENCY PLANT SHUTDOWN ang NATIONAL POWER CORPORATION (NPC)- SPUG sa HULYO 10, 2021 (DOMINGO) 1:00 PM- 5:00 PM (apat ka oras ang kalawigon) para sa pag-install sang bag-o nga FDS connection sang transformer. Ang apektado nga lugar sa ISLA GIGANTES, CARLES amo ang masunod: • Brgy. Asluman• Brgy. Gabi•… Read more

  • UNSCHEDULED POWER INTERRUPTION (JULY 8, 2022)

    Date: July 08, 2022 Time of interruption: 5:00 AM Time of restoration: 5:40 AM Affected areas: San Florentino, San Rafael and Rizal, Barotac Viejo Activity: Replaced busted fuse link due to animal contact We apologize for the inconvenience. For your information. Read more

  • FIRE SAFETY TIPS

    1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep… Read more

  • FREQUENTLY ASKED QUESTION

    ANO ANG DAPAT UBRAHON KUNG MAY ARA NGA POWER INTERRUPTION SA AMON LUGAR? Read more

  • FIRE SAFETY TIP

    Review your Fire Evacuation Plan. Read more

  • ENERGY SAVING TIP

    Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more