• UPDATE ON NGCP’S EMERGENCY POWER INTERRUPTION (As of 7:30 a.m.)

    Pahibalo sa mga katapo-konsumidores nga padayon sa gihapon ang pag-ubra sang National Grid Corporation of the Philippines (NGCP) sa pag trouble shoot sang circuit breaker sa NGCP Concepcion Substation. Sa sini nga bahin, ang power supply wala nabalik sa aton nga distribution lines sa natalana nga schedule kaina nga alas 7:00 sang aga. Padayon ang… Read more

  • SCHEDULED MANUAL LOAD DROPPING SANG NPC SA GIGANTES ISLAND

    Pahibalo sa mga katapo-konsumidores sa Gigantes Island sa mga nagluntad nga Power Interruption umpisa sang ABRIL 26, 2022 nga ini ang may kaangtangan sa Scheduled Manual Load Dropping sang National Power Corporation (NPC). Base sa sulat nga nabaton sang opisina halin sa NPC sang ABRIL 27, 2022, ang nasambit nga power load dropping ang ginpatigayon… Read more

  • NGCP’S EMERGENCY POWER INTERRUPTION ON APRIL 29, 2022

    Pahibalo sa mga katapo-konsumidores nga may EMERGENCY POWER INTERRUPTION ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa Abril 29, 2022 (Biyernes), 5:00 AM- 7:00 AM (duwa ka oras ang kalawigon) para sa pagkay-o sang guba nga insulator sa ila transmission line. Ang apektado nga lugar sang power interruption amo ang masunod:SARALEMERYAJUYCONCEPCIONSAN DIONISIOBATADESTANCIABALASANCARLES Ang NGCP… Read more

  • ENERGY SAVING TIP

    Reduce water consumption. Read more

  • ILECO III OFFICES AND AREA COVERAGE

    For complaints regarding power interruptions, please call the Area Offices to report. Thank you and keep safe our beloved MCOs. Read more

  • ENERGY SAVING TIP

    Switch to energy efficient appliances. Read more

  • REQUIREMENTS FOR CHANGE OF NAME

    DECEASED MEMBER CONSUMER1. For Spouse Applicants• Death Certificate of Member-Consumer/ BarangayCertification provided by ILECO III signedby Punong Barangay• Marriage Contract• Proof of Ownership – (e.g. deed of sale, affidavit ofheirship) (if available)2. For Legal Heirs• Death Certificate of Member-Consumer/ BarangayCertification provided by ILECO III• Notarized Waiver of Rights stating that the othersuccessors are not after… Read more

  • ITB 2404, S. 2024

    Refurbishment of Roofing, Glass Counters and Repainting of Sara Area Office. Read more

  • ITB 2403, S. 2024

    Procurement and Supply of Six (6) Units Service Vehicle for Maintenance Use in Area Offices. Read more

  • ITB 2402, S. 2024

    Procurement of Materials for Maintenance, Rehabilitation, Revamp of Lines and Capital Expenditures Read more