
POWER RATES
POWER ADVISORIES
Date: November 16, 2023 (Thursday) Time of interruption: 9:25 AM Estimated time of restoration: 12:30 PM Affected area: Bakabak, Sara (portion) Activities: Replacement of two (2) rotten poles We apologize for the inconvenience. For your information. Read more
Date: November 15, 2023 (Wednesday) Time of interruption: 7:22 p.m. Estimated time of restoration: Not yet determined Affected area/s: Feeders 2 and 3 of Sara Substation Sara Feeder 2Municipality of SaraAguirre, Antonio Yusay/Pasig, Apologista (Portion), Aspera, Ardemil, Bato, Del Castillo, Domingo, Juaneza, Latawan, Malapaya, Muyco, Poblacion Ilaya, Poblacion Market, Poblacion Ilawod, Tady Sara Feeder 3Municipality Read more
Date: November 13, 2023 (Monday) Time of interruption: 3:40 PM Time of restoration: 3:52 PM Affected area/s: One Petroleum, Camambugan, Balasan Activity: Repair private transformer neutral and secondary bushing jumper due to loose connection. We apologize for the inconvenience. Thank you for your usual understanding. For your information. Read more
NEWS AND UPDATES
This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is part of ILECO III’s empowerment program of our member-consumer-owners (MCOs). This activity is made possible with the support of ILECO III BODs and Management Committee headed Read more
1. Pag-kontrol sang konsumo sang kuryente.2. Pag-gamit sang highly resistive appliances sa tion sang off-peak (kung sa diin barato ang kuryente) ka-angay sang oven, heater, plantsa kag toasters. Likawan ang pag-gamit sang sini nga mga appliances kung peak hours humalin 6:00 PM tubtob 10:00 PM.3. Patyon ang suga sa kwarto kung wala sang tawo.4. Pagsiguro Read more
Pahibalo sa mga katapo konsumidores sang ILECO III nga may ara sang 5% nga diskwento para sa aton mga Senior Citizens nga naga-konsumo sang indi maglapaw sa 100 kwhr kag nakapa-miyembro na sa kooperatiba indi magnubo sa isa ka tuig.Ipasa ang mga masunod nga requirements sa pinakamalapit nga Area Office sang ILECO III: • Valid Read more
Reduce water consumption. Read more
BIDS AND NOTICES
Procurement of Distribution Transformer Loss Tester Read more
Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Loand, and Maintenance Use Read more