POWER RATES
POWER ADVISORIES
Power were restored in: ANILAOBANATEBAROTAC VIEJOSAN RAFAEL Additional power restored in: SAN DIONISIOLEMERY PORTION OF SARA While Daan Banwa Substation Feeder 1 was de-energized at around 11:19 PM due to Manual Load Dropping. Power restoration to affected areas is not yet determined. ILECO III Technical Team is still closely coordinating with National Grid Corporation of… Read more
Date: April 28, 2023 (Friday) Time of interruption: 11:19 PM Affected areas: Feeder 1-Daan Banwa Substation TIME OF POWER RESTORATION: NOT YET DETERMINED For your information. Read more
Power were restored in: ANILAOBANATEBAROTAC VIEJO PORTION OF ESTANCIACARLES (ISLAND BARANGAYS ONLY)PORTION OF BALASAN Additional power restored in SAN RAFAEL. Power restoration to affected areas is not yet determined. ILECO III Technical Team is still closely coordinating with National Grid Corporation of the Philippines (NGCP) and power suppliers for total power restoration of franchise coverage.… Read more
NEWS AND UPDATES
This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is part of ILECO III’s empowerment program of our member-consumer-owners (MCOs). This activity is made possible with the support of ILECO III BODs and Management Committee headed… Read more
1. Pag-kontrol sang konsumo sang kuryente.2. Pag-gamit sang highly resistive appliances sa tion sang off-peak (kung sa diin barato ang kuryente) ka-angay sang oven, heater, plantsa kag toasters. Likawan ang pag-gamit sang sini nga mga appliances kung peak hours humalin 6:00 PM tubtob 10:00 PM.3. Patyon ang suga sa kwarto kung wala sang tawo.4. Pagsiguro… Read more
Pahibalo sa mga katapo konsumidores sang ILECO III nga may ara sang 5% nga diskwento para sa aton mga Senior Citizens nga naga-konsumo sang indi maglapaw sa 100 kwhr kag nakapa-miyembro na sa kooperatiba indi magnubo sa isa ka tuig.Ipasa ang mga masunod nga requirements sa pinakamalapit nga Area Office sang ILECO III: • Valid… Read more
Reduce water consumption. Read more
BIDS AND NOTICES
15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more
Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more
Procurement of Boom Truck Read more