• SCHEDULED POWER INTERRUPTION SA HUNYO 7, 2022

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa HUNYO 07, 2022 (MARTES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa pag-clearing sang linya. Ang lugar nga apektado sang sini nga power interruption sa AJUY amo ang masunod: • Bucana Bunglas• Pantalan Navarro• Rojas• Silagon Madamo gid nga… Read more

  • UNSCHEDULED POWER INTERRUPTION (JUNE 2, 2022)

    Date: June 02, 2022 Time of interruption: 10:30 AM Time of restoration: 12:00 NN Affected area: Siempreviva, San Dionisio, Iloilo (portion) Activity: Replacement of rotten pole We apologize for the inconvenience. For your information. Read more

  • REPLACEMENT OF TRANSFORMER IN SITIO CAGAY, RIZAL, BAROTAC VIEJO

    ILECO III Technical Team replaced one (1) 25 KVA transformer in Sitio Cagay, Rizal, Barotac Viejo, Iloilo today, June 02, 2022 (Thursday). Keep safe Warriors of Light For your information. Read more

  • NOTICE TO THE PUBLIC

    Pahibalo sa mga katapo-konsumidores nga ang HUNYO 12, 2023 (LUNES) ang gin-deklara nga REGULAR HOLIDAY sa bug-os nga pungsod para sa pag-obserba sang INDEPENDENCE DAY. Bangud sini, SARADO ang ILECO III Main Office SARA AREA OFFICE kag NATIVIDAD AREA OFFICE sa nasambit nga adlaw. Apang BUKAS ang PANI-AN AREA OFFICE para sa pagbaton sang bayad… Read more

  • ENERGY SAVING TIP

    Use natural light when possible. Read more

  • LOOK: ILECO III Personnel conducted BAPA Officers Meeting nad Information Education Campaign (IEC) attended by 34 BAPA Members in Latawan, Sara Iloilo on June 5, 2023 (Monday)

    This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is part of ILECO III’s empowerment program of our member-consumer-owners (MCOs). This activity is made possible with the support of ILECO III BODs and Management Committee headed… Read more

  • ILECO III ENERGY SAVING TIPS

    1. Pag-kontrol sang konsumo sang kuryente.2. Pag-gamit sang highly resistive appliances sa tion sang off-peak (kung sa diin barato ang kuryente) ka-angay sang oven, heater, plantsa kag toasters. Likawan ang pag-gamit sang sini nga mga appliances kung peak hours humalin 6:00 PM tubtob 10:00 PM.3. Patyon ang suga sa kwarto kung wala sang tawo.4. Pagsiguro… Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more