• POWER ADVISORY

    NAHANUNGOD SA NAGA LAPTA NGA MESSAGE SA ATON NGA FB MESSENGER  Read more

  • POWER ADVISORY UPDATE as of 12:00 p.m., April 30, 2023

    Sa subong nga ti-on ang TANAN nga feeders sang mga masunod nga substations ang aton na nga na-energized: Sara Substation Ajuy Substation Banate Substation Balasan Substation Daan Banwa Substation Barotac Viejo Substation Ang aton nga mga feeders ang 100% energized na sa kabilugan nga coverage sang ILECO III. Sa liwat, ang mga nag-kalatabo nga shutdown… Read more

  • POWER ADVISORY UPDATE as of 10:00 p.m., April 29, 2023

    Sa subong nga ti-on ang mga energized nga mga feeders amo ang mga masunod: Sara Substation- Feeders 1 to 3 remain online except for Feeder 4 due to rotational brownout and was shutdown @ 4:40 PM Ajuy Substation – Feeder 1 was shutdown (Portion sang Ajuy kag Concepcion) 4:39 PM due to rotational brownout and… Read more

  • LOOK: ILECO III-THE FIRST EC WITH THE MOST NUMBER OF LINEMEN CERTIFIED AS COMPETENT BY TESDA FOR EPDLC-NCII IN VISAYAS

    Forty (40) out of 43 linemen of ILECO III had passed the TESDA competency assessment for Electric Power Distribution Line Construction NC II last June 6-9, 2023 at TESDA Accredited Assessment Center, Iloilo III Electric Cooperative, Inc., Brgy. Preciosa, Sara, Iloilo. The Assessment was conducted by TESDA Accredited Assessor, Engr. Rodel F. Anado of GUIMELCO… Read more

  • ENERGY SAVING TIP

    Clean your fridge and avoid opening it longer necessary. Read more

  • NOTICE TO THE PUBLIC

    Pahibalo sa mga katapo-konsumidores nga ang HUNYO 12, 2023 (LUNES) ang gin-deklara nga REGULAR HOLIDAY sa bug-os nga pungsod para sa pag-obserba sang INDEPENDENCE DAY. Bangud sini, SARADO ang ILECO III Main Office SARA AREA OFFICE kag NATIVIDAD AREA OFFICE sa nasambit nga adlaw. Apang BUKAS ang PANI-AN AREA OFFICE para sa pagbaton sang bayad… Read more

  • ENERGY SAVING TIP

    Use natural light when possible. Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more