• UNSCHEDULED POWER INTERRUPTION (JULY 14, 2023)

    Date: July 14, 2023 Time of interruption: 9:45 AM Time of restoration: 12:00 NN Affected area: Agnaga, Concepcion, Iloilo (portion) Action taken: Relocation of 30 feet steel pole and open secondary line due to road obstruction We apologize for the inconvenience. Keep safe Warriors of Light! National Electrification Administration Read more

  • MAY EMERGENCY CORRECTIVE MAINTENANCE ANG NGCP SA HULYO 15, 2023

    Pahibalo sa mga katapo-konsumidores nga may patigayunon nga EMERGENCY CORRECTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 50 MVA Transformer No. 2 sa Dingle Substation sa HULYO 15, 2023 (SABADO). Ang oras kag apektado nga lugar sang sini power interruption amo ang masunod: HULYO 15, 2023 (SABADO)6:00 AM- 6:00 PM (12… Read more

  • SUPPLEMENTAL POWER ADVISORY

    Pahibalo sa mga katapo-konsumidores nga ang SCHEDULED PREVENTIVE MAINTENANCE kag LOAD TRANSFER sang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 69 kV Sara-Estancia Transmission Line Section sa HULYO 15, 2023 (SABADO) ang nagbag-o ang oras sa mga apektado nga lugar sa Pani-an Area Coverage. Ang oras kag apektado nga lugar sang sini power… Read more

  • LOOK: ILECO III-THE FIRST EC WITH THE MOST NUMBER OF LINEMEN CERTIFIED AS COMPETENT BY TESDA FOR EPDLC-NCII IN VISAYAS

    Forty (40) out of 43 linemen of ILECO III had passed the TESDA competency assessment for Electric Power Distribution Line Construction NC II last June 6-9, 2023 at TESDA Accredited Assessment Center, Iloilo III Electric Cooperative, Inc., Brgy. Preciosa, Sara, Iloilo. The Assessment was conducted by TESDA Accredited Assessor, Engr. Rodel F. Anado of GUIMELCO… Read more

  • ENERGY SAVING TIP

    Clean your fridge and avoid opening it longer necessary. Read more

  • NOTICE TO THE PUBLIC

    Pahibalo sa mga katapo-konsumidores nga ang HUNYO 12, 2023 (LUNES) ang gin-deklara nga REGULAR HOLIDAY sa bug-os nga pungsod para sa pag-obserba sang INDEPENDENCE DAY. Bangud sini, SARADO ang ILECO III Main Office SARA AREA OFFICE kag NATIVIDAD AREA OFFICE sa nasambit nga adlaw. Apang BUKAS ang PANI-AN AREA OFFICE para sa pagbaton sang bayad… Read more

  • ENERGY SAVING TIP

    Use natural light when possible. Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more