With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substation of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM The following substations are still UNENERGIZED as of reporting Read more
Time of interruption: 6:54 p.m.Estimated time of power restoration: Not yet determinedAffected Areas: Whole coverage area of ILECO III Our Technical Team is currently coordinating with NGCP for the cause of this power interruption which affected the ENTIRE PANAY ISLAND and MOST PARTS of NEGROS ISLAND. The estimated time of power restoration cannot be determined Read more
Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa patigayunon nga clearing activities. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions sa banwa sang BAROTAC VIEJO amo ang masunod: PETSA KAG ORAS APEKTADO NGA LUGARMARSO 11, 2024 (LUNES)8:00 AM- 5:00 PM (9 ka oras ang kalawigon)• Read more
NEWS AND UPDATES
Forty (40) out of 43 linemen of ILECO III had passed the TESDA competency assessment for Electric Power Distribution Line Construction NC II last June 6-9, 2023 at TESDA Accredited Assessment Center, Iloilo III Electric Cooperative, Inc., Brgy. Preciosa, Sara, Iloilo. The Assessment was conducted by TESDA Accredited Assessor, Engr. Rodel F. Anado of GUIMELCO Read more
Clean your fridge and avoid opening it longer necessary. Read more
Pahibalo sa mga katapo-konsumidores nga ang HUNYO 12, 2023 (LUNES) ang gin-deklara nga REGULAR HOLIDAY sa bug-os nga pungsod para sa pag-obserba sang INDEPENDENCE DAY. Bangud sini, SARADO ang ILECO III Main Office SARA AREA OFFICE kag NATIVIDAD AREA OFFICE sa nasambit nga adlaw. Apang BUKAS ang PANI-AN AREA OFFICE para sa pagbaton sang bayad Read more
Use natural light when possible. Read more
BIDS AND NOTICES
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Procurement of Poles Read more