• UPDATED SUPPLEMENTAL POWER ADVISORY

    Pahibalo sa mga katapo-konsumidores nga may patigayunon nga LOAD TRANSFER ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 69 KV Concepcion-Estancia Transmission Line sa HUNYO 01, 2024 (SABADO), gin-islan ang oras humalin 4:00 PM- 6:00 PM (2 ka oras ang kalawigon). Ang oras kag apektado nga lugar sang sini nga power interruption amo Read more

  • UNSCHEDULED POWER INTERRUPTION

    Date: May 30, 2024 (Thursday) Time of interruption: 12:27 PM Time of restoration: 1:17 PM Affected areas: Sara S/S Feeder 1- Sara (portion) and San Dionisio, Iloilo Cause: Tree felled on the Primary Line due to cutting activities done by our MCO For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION

    Date: May 30, 2024 Time of interruption: 5:20 AM Time of restoration: 6:01 AM Affected area: Culasi, Ajuy, Iloilo Cause: Line fault due to animal contact For your information. Read more

  • LOOK: ILECO III-THE FIRST EC WITH THE MOST NUMBER OF LINEMEN CERTIFIED AS COMPETENT BY TESDA FOR EPDLC-NCII IN VISAYAS

    Forty (40) out of 43 linemen of ILECO III had passed the TESDA competency assessment for Electric Power Distribution Line Construction NC II last June 6-9, 2023 at TESDA Accredited Assessment Center, Iloilo III Electric Cooperative, Inc., Brgy. Preciosa, Sara, Iloilo. The Assessment was conducted by TESDA Accredited Assessor, Engr. Rodel F. Anado of GUIMELCO Read more

  • ENERGY SAVING TIP

    Clean your fridge and avoid opening it longer necessary. Read more

  • NOTICE TO THE PUBLIC

    Pahibalo sa mga katapo-konsumidores nga ang HUNYO 12, 2023 (LUNES) ang gin-deklara nga REGULAR HOLIDAY sa bug-os nga pungsod para sa pag-obserba sang INDEPENDENCE DAY. Bangud sini, SARADO ang ILECO III Main Office SARA AREA OFFICE kag NATIVIDAD AREA OFFICE sa nasambit nga adlaw. Apang BUKAS ang PANI-AN AREA OFFICE para sa pagbaton sang bayad Read more

  • ENERGY SAVING TIP

    Use natural light when possible. Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more