• SCHEDULED POWER INTERRUPTION SA BANWA SANG SAN DIONISIO(ENERO 8, 2023)

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-relocate sang mga Three-Phase Line, pag-disconnect kag pag-reconnect sang fuse cut-out. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions sa banwa sang SAN DIONISIO amo ang masunod: ENERO 08, 2023 (DOMINGO)8:00 AM- 9:00 AM (1 ka oras… Read more

  • UNSCHEDULED POWER INTERRUPTION (JANUARY 4, 2023)

    Date: January 04, 2023 (Wednesday) Time of interruption: 9:23 AM Time of restoration: 9:45 AM Affected area: Toll House, San Lucas, Barotac Viejo, Iloilo Activity: Repaired damage neutral and secondary line We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (JANUARY 4, 2023)

    Date: January 04, 2023 (Wednesday) Time of interruption: 9:39 AM Time of restoration: 10:09 AM Affected area: Agbatuan, Anilao, Iloilo Activity: Repaired terminal bossing of distribution transformer We apologized for the inconvenience. For your information. Read more

  • LOOK: ILECO III-THE FIRST EC WITH THE MOST NUMBER OF LINEMEN CERTIFIED AS COMPETENT BY TESDA FOR EPDLC-NCII IN VISAYAS

    Forty (40) out of 43 linemen of ILECO III had passed the TESDA competency assessment for Electric Power Distribution Line Construction NC II last June 6-9, 2023 at TESDA Accredited Assessment Center, Iloilo III Electric Cooperative, Inc., Brgy. Preciosa, Sara, Iloilo. The Assessment was conducted by TESDA Accredited Assessor, Engr. Rodel F. Anado of GUIMELCO… Read more

  • ENERGY SAVING TIP

    Clean your fridge and avoid opening it longer necessary. Read more

  • NOTICE TO THE PUBLIC

    Pahibalo sa mga katapo-konsumidores nga ang HUNYO 12, 2023 (LUNES) ang gin-deklara nga REGULAR HOLIDAY sa bug-os nga pungsod para sa pag-obserba sang INDEPENDENCE DAY. Bangud sini, SARADO ang ILECO III Main Office SARA AREA OFFICE kag NATIVIDAD AREA OFFICE sa nasambit nga adlaw. Apang BUKAS ang PANI-AN AREA OFFICE para sa pagbaton sang bayad… Read more

  • ENERGY SAVING TIP

    Use natural light when possible. Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more