• SCHEDULED POWER INTERRUPTION SA BANWA SANG BANATE SA AGOSTO 28, 2024

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa AGOSTO 28, 2024 (MIYERKULES), 7:00 AM- 5:00 PM (10 ka oras ang kalawigon) para sa pag-clearing sang linya. Ang lugar nga apektado sang sini nga power interruption sa banwa sang BANATE amo ang: • Bariga • Bobon • Carmelo (portion) • Dela Read more

  • SCHEDULED POWER INTERRUPTION SA BANWA SANG BATAD, BALASAN KAG ESTANCIA SA AGOSTO 24, 2024

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa AGOSTO 24, 2024 (SABADO), 6:00 AM- 5:00 PM (11 ka oras ang kalawigon) para sa pag-clearing sang linya, pag-install sang cut-out kag pag-ilis sang steel pins. Ang lugar nga apektado sang sini nga power interruption amo ang masunod: • BATAD – (Tanan Read more

  • SCHEDULED POWER INTERRUPTION SA BANWA SANG CARLES SA SETYEMBRE 2 KAG 3

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-clearing sang linya kag pag-ilis sang pole top pins kag steel pins. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions sa banwa sang CARLES amo ang masunod: SETYEMBRE 02, 2024 (MARTES) 8:00 AM- 5:00 PM (9 ka Read more

  • ENERGY SAVING TIP

    Stay up to date on maintenance to save energy. Read more

  • FIRE SAFETY TIPS

    1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep Read more

  • ENERGY SAVING TIP

    Dry your clothes and dishes naturally. Read more

  • HAPPY BIRTHDAY CONGRESSMAN TUPAS!

    HAPPY BIRTHDAY HON. RAUL C. TUPAS, Congressman, 5th District of Iloilo Province. From ILECO III Family! Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more