• UNSCHEDULED POWER INTERRUPTION (AUGUST 14, 2022)

    Date: August 14, 2022 Time of interruption: 8:56 AM Time of Restoration: 10:01 AM Reason: Transient line fault Affected Area: Bulak Sur, Batad Activity: Inspection of lines and re-fusing We apologize for the inconvenience. For your information. Read more

  • SCHEDULED POWER INTERRUPTION SA AGOSTO 18 KAG 19, 2022

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-clearing sang linya. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions sa BANATE amo ang masunod: PETSA, ORAS KAG APEKTADO NGA LUGARAGOSTO 18, 2022 (HUWEBES)8:00 AM- 5:00 PM (9 ka oras ang kalawigon)• Sitio Bariga Sulod, Bariga… Read more

  • UNSCHEDULED POWER INTERRUPTION (AUGUST 13, 2022)

    Date: August 13, 2022 Time of interruption: 5:20 PM Time of Restoration: 6:05 PM Affected Area: Portion of NHA Village, Dayhagan, Carles Activity: Inspection of lines and replaced busted fuse link We apologize for the inconvenience. For your information. Read more

  • 125TH INDEPENDENCE DAY

    “Our noble aspirations for nationhood, long cherished and arduously contended for by our people, will be realized. We will enter upon a new existence in which our individual lives will form together a single current, recognized and identified in the ebb and flow of world events as distinctly Filipino.” – Frm President Manuel Roxas #ileco3IndependenceDay2023 Read more

  • ENERGY SAVING TIP

    Stay up to date on maintenance to save energy. Read more

  • FIRE SAFETY TIPS

    1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep… Read more

  • ENERGY SAVING TIP

    Dry your clothes and dishes naturally. Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more