• UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 12, 2023)

    Date: September 12, 2023 (Tuesday) Time of interruption: 11:30 AM Estimated time of restoration: 11:55 AM Affected Area/s: Brgy. Sto. Rosario, Anilao Activity: Inserting of Pole due to sagging of single phase line. We apologize for the inconvenience. For your information. Read more

  • SCHEDULED POWER INTERRUPTION SA BANWA SANG BANATE SA SETYEMBRE 6, 2023

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa SETYEMBRE 06, 2023 (MIYERKULES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa patigayunon nga technical activities. Ang lugar nga apektado sang sini nga power interruptions sa banwa sang BANATE amo ang masunod:• Poblacion (portion)• Bularan (portion)• Talokgangan• San Salvador Read more

  • UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 2, 2023)

    Date: September 02, 2023 (Saturday) Time of interruption: 6:05 AM Estimated time of restoration: NOT YET DETERMINED Affected Areas: All barangays in San Rafael, Iloilo Cause/Reason: Damaged poles and lines due to vehicle accident Our technical team is currently preparing for immediate power restoration. We apologize for the inconvenience. For your information. Read more

  • ENERGY SAVING TIP

    Stay up to date on maintenance to save energy. Read more

  • FIRE SAFETY TIPS

    1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep Read more

  • ENERGY SAVING TIP

    Dry your clothes and dishes naturally. Read more

  • HAPPY BIRTHDAY CONGRESSMAN TUPAS!

    HAPPY BIRTHDAY HON. RAUL C. TUPAS, Congressman, 5th District of Iloilo Province. From ILECO III Family! Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more