• NGCP UNSCHEDULED POWER INTERRUPTION (JANUARY 2, 2024)

    Date: January 02, 2024 (Tuesday)Time of interruption: 2:20 PMTime of restoration: NOT YET DETERMINED Affected areas: Anilao, Banate, Barotac Viejo, San Rafael, Ajuy, Concepcion, Sara, Lemery, San Dionisio, Batad, Balasan, Estancia, Carles Cause of interruption: System disturbance which affected the entire Panay sub grid. Maintenance Team is closely coordinating with NGCP regarding the cause and Read more

  • UNSCHEDULED POWER INTERRUPTION (DECEMBER 31, 2023)

    Date: December 31, 2023 Time of interruption: 6:37 PM Time of restoration: 7:09 PM Affected area: Tapi-an, Batad, Iloilo Activity: Replaced damaged connector We apologize for the inconvenience. For your information. Read more

  • SCHEDULED POWER INTERRUPTION SA ENERO 5, 2024

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa ENERO 05, 2024 (BIYERNES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa patigayunon nga technical activities. Ang lugar nga apektado sang sini nga power interruption sa banwa sang SAN DIONISIO amo ang masunod:• Agdaliran Madamo gid nga salamat sa Read more

  • ENERGY SAVING TIP

    Stay up to date on maintenance to save energy. Read more

  • FIRE SAFETY TIPS

    1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep Read more

  • ENERGY SAVING TIP

    Dry your clothes and dishes naturally. Read more

  • HAPPY BIRTHDAY CONGRESSMAN TUPAS!

    HAPPY BIRTHDAY HON. RAUL C. TUPAS, Congressman, 5th District of Iloilo Province. From ILECO III Family! Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more