• INSTALLATION OF POLE GROUNDING IN BAROTAC VIEJO

    ILECO III Technical Team conducts installation of pole grounding in Barotac Viejo, Iloilo on May 24, 2022 (Tuesday). For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (MAY 24, 2022)

    Date: May 24, 2022 Time of interruption: 7:55 AM Time of restoration: 8:45 AM Affected area: Cawayan Sulod, Carles, Iloilo Activity: Inspection of line and replaced busted fuse Link We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (MAY 23, 2022)

    Date: May 23, 2022 (Monday) Time of interruption: 7:00 PM Time of restoration: 7:34 PM Affected area: Daan Banwa, Estancia, Iloilo Activity: Repaired secondary bushing jumper of transformer We apologize for the inconvenience. For your information. Read more

  • ANTI-OBSTRUCTION OF POWER LINES ACT

    (REPUBLIC ACT 11361) ‘An Act Ensuring the Continuous and Uninterrupted Transmission and Distribution of Electricity and Protection of the Integrity and Reliability of Power Lines, and Providing Penalties for Violations Thereof.’ Ginadumili-an ang mga masunod: 1. Pagtanom sang maskin ano nga sahi sang matag-as ukon naga-taas nga mga tanom ukon kahoy sa idalom sang distribution… Read more

  • 125TH INDEPENDENCE DAY

    “Our noble aspirations for nationhood, long cherished and arduously contended for by our people, will be realized. We will enter upon a new existence in which our individual lives will form together a single current, recognized and identified in the ebb and flow of world events as distinctly Filipino.” – Frm President Manuel Roxas #ileco3IndependenceDay2023 Read more

  • ENERGY SAVING TIP

    Stay up to date on maintenance to save energy. Read more

  • FIRE SAFETY TIPS

    1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep… Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more