• UNSCHEDULED POWER INTERRUPTION (AUGUST 17, 2022)

    Date: August 17, 2022 Time of interruption: 9:13 AM Time of Restoration: 9:44 AM Affected Area: Villa Pani-an, Estancia Activity: Repair secondary bushing transformer loose connection We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (AUGUST 17, 2022)

    Date: August 17, 2022 Time of interruption: 2:03 PM Time of Restoration: 02:34 PM Affected Area: Portion of Brgy. Pa-on, Estancia Activity: Repair neutral bushing of 25kVa Transformer We apologize for the inconvenience. For your information. Read more

  • REPLACEMENT OF KWHR METERS IN CABUGUANA, CARLES

    ILECO III personnel conducted replacement of two (2) kWhr Meter due to no display and also replace 1 kWhr Meter due to lightning surge at Cabuguana, Carles today, August 17, 2022 (Wednesday). Keep safe Warriors of Light For your information. Read more

  • 125TH INDEPENDENCE DAY

    “Our noble aspirations for nationhood, long cherished and arduously contended for by our people, will be realized. We will enter upon a new existence in which our individual lives will form together a single current, recognized and identified in the ebb and flow of world events as distinctly Filipino.” – Frm President Manuel Roxas #ileco3IndependenceDay2023 Read more

  • ENERGY SAVING TIP

    Stay up to date on maintenance to save energy. Read more

  • FIRE SAFETY TIPS

    1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep… Read more

  • ENERGY SAVING TIP

    Dry your clothes and dishes naturally. Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more