• RECONNECTION OF PULL OUT KWHR METER AND REPLACED METER BASE LOOSE CONNECTION IN BATAD

    ILECO III Technical personnel conducted reconnection of pulled out kWhr Meter and replaced meter base loose connection at Brgy. Hall, Caw-I, Batad today, October 15, 2022 (Saturday). Keep safe Warriors of Light For your information. Read more

  • ILECO III POWER ADVISORY (OCTOBER 15, 2022)

    *Update on NGCP’s unscheduled power interruption Power has been restored to all affected areas in our coverage. Time of power restoration as follows:Natividad Area Coverage: 3:13 a.m.Sara Area Coverage: 3:17 a.m.Panian Area Coverage: 3:17 a.m We apologize for the inconvenience. Thank you for your understanding. Read more

  • ILECO III POWER ADVISORY (OCTOBER 15, 2022)

    What: UNSCHEDULED POWER INTERRUPTION of NATIONAL GRID CORP. OF THE PHILS. (NGCP)Time of Interruption: 12:59 a.m.Estimated Time of Power Restoration: Not yet determinedCause of Interruption: To be determined by NGCPAffected Areas: Municipalities of Anilao, Banate, Barotac Viejo, San Rafael, Ajuy, Sara, Lemery, San Dionisio, Concepcion, Batad, Estancia, Balasan, Carles (entire Panay Island) Our Technical Team… Read more

  • ENERGY SAVING TIP

    Stay up to date on maintenance to save energy. Read more

  • FIRE SAFETY TIPS

    1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep… Read more

  • ENERGY SAVING TIP

    Dry your clothes and dishes naturally. Read more

  • HAPPY BIRTHDAY CONGRESSMAN TUPAS!

    HAPPY BIRTHDAY HON. RAUL C. TUPAS, Congressman, 5th District of Iloilo Province. From ILECO III Family! Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more