• UNSCHEDULED POWER INTERRUPTION (NOVEMBER 11, 2022)

    Date: November 11, 2022Time of interruption: 3:33 PMTime of Restoration: 4:41 PM Cause of interruption: Line fault due to damaged pin insulator in front of PET Gasoline Station Affected areas: Brgy. Aspera, Brgy. Antonio Yusay and Brgy. Poblacion Ilaya, Sara, Iloilo We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (NOVEMBER 11, 2022)

    Date: November 11, 2022Time of interruption: 10:05 AMTime of Restoration: 10:44 AM Cause of interruption: Transient line fault Affected areas: Brgy. Aspera, Brgy. Antonio Yusay and Brgy. Poblacion Ilaya, Sara, Iloilo We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (NOVEMBER 9, 2022)

    Date: November 9, 2022 Time of interruption: 6:40 PM Time of Restoration: 7:45 PM Affected Area: Villahermosa, Sara, Cabantohan, Dapdapan, Omio, Marapal, Alcantara, Yawyawan, Layog Bato and Sitio Talaytay, Poblacion, Lemery Activity: Duplex wire contacted primary line due to vehicular incident in Brgy. Arante, Sara We apologize for the inconvenience. For your information. Read more

  • ENERGY SAVING TIP

    Stay up to date on maintenance to save energy. Read more

  • FIRE SAFETY TIPS

    1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep… Read more

  • ENERGY SAVING TIP

    Dry your clothes and dishes naturally. Read more

  • HAPPY BIRTHDAY CONGRESSMAN TUPAS!

    HAPPY BIRTHDAY HON. RAUL C. TUPAS, Congressman, 5th District of Iloilo Province. From ILECO III Family! Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more