• UNSCHEDULED POWER INTERRUPTION (AUGUST 25, 2023)

    Date: August 25, 2023 (Friday) Time of interruption: 7:10 AM Time of restoration: 8:00 AM Affected areas: Salong, Batad Action Taken: Inspection of primary line, pull-out animal contact (bird) and replaced busted fuse link We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (AUGUST 25, 2023)

    Date: August 25, 2023 (Friday) Time of interruption: 10:55 AM Time of restoration: 11:28 AM Affected areas: Gomez St., Poblacion, Carles Action Taken: Inspection of secondary line and replaced busted fuse link We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (AUGUST 25, 2023)

    Date: August 25, 2023 (Friday) Time of interruption: 4:04 AM Time of restoration: 9:31 AM Affected areas: C. Pedrana and S. Ganzon St., Poblacion, Balasan Action Taken: Repaired connection and repaired two (2) pieces damaged transformer bushing We apologize for the inconvenience. For your information. Read more

  • ENERGY SAVING TIP

    Stay up to date on maintenance to save energy. Read more

  • FIRE SAFETY TIPS

    1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep Read more

  • ENERGY SAVING TIP

    Dry your clothes and dishes naturally. Read more

  • HAPPY BIRTHDAY CONGRESSMAN TUPAS!

    HAPPY BIRTHDAY HON. RAUL C. TUPAS, Congressman, 5th District of Iloilo Province. From ILECO III Family! Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more