• SCHEDULED POWER INTERRUPTION SA BANWA SANG BAROTAC VIEJO SA DISYEMBRE 5, 2023

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa DISYEMBRE 05, 2023 (MARTES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa patigayunon nga conversion sang Open Secondary Line pakadto sa Single Phase Line. Ang lugar nga apektado sang sini nga power interruption sa BAROTAC VIEJO amo ang masunod: Read more

  • SCHEDULE POWER INTERRUPTION SA BANWA SANG BATAD SA DISYEMBRE 8, 2023

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa DISYEMBRE 08, 2023 (BIYERNES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa pag-ilis sang mga poste kag iban pa nga technical activities. Ang lugar nga apektado sang sini nga power interruption amo ang Jaleco Village, Poblacion, Batad. Madamo gid Read more

  • SCHEDULED POWER INTERRUPTION SA BANWA SANG SAN RAFAEL SA DISYEMBRE 4, 2023

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa DISYEMBRE 04, 2023 (LUNES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa patigayunon nga conversion sang Open Secondary Line pakadto sa Single Phase Line. Ang lugar nga apektado sang sini nga power interruption amo ang Sitio Apo, San Andres, Read more

  • ENERGY SAVING TIP

    Stay up to date on maintenance to save energy. Read more

  • FIRE SAFETY TIPS

    1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep Read more

  • ENERGY SAVING TIP

    Dry your clothes and dishes naturally. Read more

  • HAPPY BIRTHDAY CONGRESSMAN TUPAS!

    HAPPY BIRTHDAY HON. RAUL C. TUPAS, Congressman, 5th District of Iloilo Province. From ILECO III Family! Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more