
POWER RATES
POWER ADVISORIES
Pahibalo sa mga katapo-konsumidores nga KANSELADO ang SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila sa ila 50 MVA Transformer #1 sa Panit-an Substation sa MARSO 03, 2024 (DOMINGO). Ang oras kag apektado nga lugar sang sini nga CANCELLED power interruption amo ang masunod: 5:00 AM- 7:00 AM (2 ka Read more
As of 12:30 AM, March 2, 2024 Power was FULLY RESTORED in the entire coverage area of ILECO III. Ajuy S/s Time of Interruption: 6:54 PM, March 1, 2024 Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Time of Interruption: 7:05 PM, March 1, 2024 Feeder 1 – Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substations of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Feeder 1 – ENERGIZED at 11:03 PM Read more
NEWS AND UPDATES
HAPPY BIRTHDAY HON. MA. THERESA F. DEBUQUE, VICE MAYOR OF ANILAO, ILOILO. From ILECO III Family! Read more
This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is part of ILECO III’s empowerment program of our member-consumer-owners (MCOs). This activity is made possible with the support of ILECO III BODs and Management Committee headed Read more
(REPUBLIC ACT 11361) ‘An Act Ensuring the Continuous and Uninterrupted Transmission and Distribution of Electricity and Protection of the Integrity and Reliability of Power Lines, and Providing Penalties for Violations Thereof.’ Ginadumili-an ang mga masunod: 1. Pagtanom sang maskin ano nga sahi sang matag-as ukon naga-taas nga mga tanom ukon kahoy sa idalom sang distribution Read more
“Our noble aspirations for nationhood, long cherished and arduously contended for by our people, will be realized. We will enter upon a new existence in which our individual lives will form together a single current, recognized and identified in the ebb and flow of world events as distinctly Filipino.” – Frm President Manuel Roxas #ileco3IndependenceDay2023 Read more
BIDS AND NOTICES
Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Five (5) Barangays (Brgy. Barangcalan, Brgy. Bito-on, Brgy. Talingting, Brgy. Tinigban, and Brgy. Punta Batuanan) in Calagnaan Island, Carles, Iloilo (Turn Key) Read more
Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials from Brgy. Poblacion to Brgy. Daculan, Estancia and Brgy. Manlot, Manlot Island, Carles, Iloilo(Turn Key) Read more
Invitation to Bid for the Design, Supply, Delivery, Installation, Testing and Commissioning of Three-Phase Submarine Line Cable from Brgy. Daculan, Estancia to Brgy. Manlot, Carles, from Brgy. Manlot to Brgy. Talingting, Carles and from Brgy. Punta Batuanan to Brgy. San Fernando, Carles, Iloilo (Turn Key) Read more