
POWER RATES
POWER ADVISORIES
Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa HUNYO 25, 2024 (MARTES), 4:30 AM- 6:30 PM (14 ka oras ang kalawigon) para sa pag-energize sang Balasan Substation, pull-out sang power fuse kag disconnect switch, pag-ilis sang mga cross-arm, steel pins kag pole top pins, pag-kuha sang guba nga poste kag Read more
Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa HUNYO 22, 2024 (SABADO), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa pag-construct sang Single Phase Line. Ang lugar nga apektado sang sini nga power interruption sa banwa sang LEMERY amo ang: • Agpipili • Alcantara • Buenavista • Read more
Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa HUNYO 22, 2024 (SABADO), 7:00 AM- 5:00 PM (10 ka oras ang kalawigon) para sa pag-kuha sang guba nga poste kag conductors. Ang lugar nga apektado sang sini nga power interruption sa banwa sang BANATE amo ang: • Libertad Madamo gid nga Read more
NEWS AND UPDATES
The agendas discuss were the ff: 1. Lifeline Rate Subsidy 2. Power Interruptions 3. Change of Name 4. Senior Citizen Discount 5. The importance of a well informed MCO of their cooperative; 6. Other matter that could help them be aware of the operations of the coop 7. BAPA operations and its element The Information Read more
Some of the agenda presented to the above-mentioned attendees were the following: a. Status of Operation b. Damaged Solar PVM c. Coop Updates d. Open Forum The Information Education Campaign (IEC) is part of ILECO III’s empowerment program to our Member-Consumer-Owners. Series of meetings were conducted to inform the members of the status of operation Read more
Some of the agenda presented to the above-mentioned attendees were the following: a. Status of Operation b. Damaged Solar PVM c. Coop Updates d. Open Forum The Information Education Campaign (IEC) is part of ILECO III’s empowerment program to our Member-Consumer-Owners. Series of meetings were conducted to inform the members of the status of operation Read more
On July 06, 2023, Aklan Electric Cooperative, Inc. (AKELCO) conducted a benchmarking activity at Iloilo III Electric Cooperative, Inc. (ILECO III) on its Meter Reading, Billing and Collection System and other best practices. The benchmarking team of AKELCO headed by Ms. Mega M. Arcenio, Finance Services Department Manager, and Mr. Jose Francisco Ramos II, Commercial Read more
BIDS AND NOTICES
Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Five (5) Barangays (Brgy. Barangcalan, Brgy. Bito-on, Brgy. Talingting, Brgy. Tinigban, and Brgy. Punta Batuanan) in Calagnaan Island, Carles, Iloilo (Turn Key) Read more
Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials from Brgy. Poblacion to Brgy. Daculan, Estancia and Brgy. Manlot, Manlot Island, Carles, Iloilo(Turn Key) Read more
Invitation to Bid for the Design, Supply, Delivery, Installation, Testing and Commissioning of Three-Phase Submarine Line Cable from Brgy. Daculan, Estancia to Brgy. Manlot, Carles, from Brgy. Manlot to Brgy. Talingting, Carles and from Brgy. Punta Batuanan to Brgy. San Fernando, Carles, Iloilo (Turn Key) Read more