• KANSELADO ANG SCHEDULED PREVENTIVE MAINTENANCE SANG NGCP SA MARSO 3, 2024

    Pahibalo sa mga katapo-konsumidores nga KANSELADO ang SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila sa ila 50 MVA Transformer #1 sa Panit-an Substation sa MARSO 03, 2024 (DOMINGO). Ang oras kag apektado nga lugar sang sini nga CANCELLED power interruption amo ang masunod: 5:00 AM- 7:00 AM (2 ka Read more

  • POWER RESTORATION UPDATE

    As of 12:30 AM, March 2, 2024 Power was FULLY RESTORED in the entire coverage area of ILECO III. Ajuy S/s Time of Interruption: 6:54 PM, March 1, 2024 Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Time of Interruption: 7:05 PM, March 1, 2024 Feeder 1 – Read more

  • NGCP UNSCHEDULED POWER INTERRUPTION (MARCH 1, 2024 UPDATE as of 11:30 PM)

    With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substations of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Feeder 1 – ENERGIZED at 11:03 PM Read more

  • Watch the 2nd National Summit Warriors of Light and 2023 Linemen Rodeo held in MORESCO 1, Laguindingan, Misamis Oriental on June 29, 2023

    National Electrification Administration Philippine Rural Electric Cooperatives Association DISCLAIMER: We do not own the music used. No copyright infringement intended. All rights reserved to rightful owners. For entertainment purposes only .Sundalong Pailaw; Written by Jefferson “Shadow” Velasco (Composed and Music) and Carlos Ocampo, Jr. (Lyrics); Performed by Shadow; Courtesy of Pampanga 2 Electric Cooperative, Inc. Read more

  • ILECO III OFFICES AND AREA COVERAGE

    For complaints regarding power interruptions, please call the Area Offices to report. Thank you and keep safe our beloved MCOs. Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION- Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION- Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa Read more

  • HAPPY BIRTHDAY VICE MAYOR GANZON!

    Happy birthday HON. MANUEL C. GANZON, Municipal Vice Mayor- Balasan, Iloilo.From ILECO III Family! Manuel Ganzon Read more

  • ITB 2407, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Five (5) Barangays (Brgy. Barangcalan, Brgy. Bito-on, Brgy. Talingting, Brgy. Tinigban, and Brgy. Punta Batuanan) in Calagnaan Island, Carles, Iloilo (Turn Key) Read more

  • ITB 2406, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials from Brgy. Poblacion to Brgy. Daculan, Estancia and Brgy. Manlot, Manlot Island, Carles, Iloilo(Turn Key) Read more

  • ITB 2405, S. 2024

    Invitation to Bid for the Design, Supply, Delivery, Installation, Testing and Commissioning of Three-Phase Submarine Line Cable from Brgy. Daculan, Estancia to Brgy. Manlot, Carles, from Brgy. Manlot to Brgy. Talingting, Carles and from Brgy. Punta Batuanan to Brgy. San Fernando, Carles, Iloilo (Turn Key) Read more