
POWER RATES
POWER ADVISORIES
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substation of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM The following substations are still UNENERGIZED as of reporting Read more
Time of interruption: 6:54 p.m.Estimated time of power restoration: Not yet determinedAffected Areas: Whole coverage area of ILECO III Our Technical Team is currently coordinating with NGCP for the cause of this power interruption which affected the ENTIRE PANAY ISLAND and MOST PARTS of NEGROS ISLAND. The estimated time of power restoration cannot be determined Read more
Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa patigayunon nga clearing activities. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions sa banwa sang BAROTAC VIEJO amo ang masunod: PETSA KAG ORAS APEKTADO NGA LUGARMARSO 11, 2024 (LUNES)8:00 AM- 5:00 PM (9 ka oras ang kalawigon)• Read more
NEWS AND UPDATES
Mag-gamit sang electric fan sa baylo sang air conditioning system. Read more
Attendees are 219 beneficiaries of NHA Village, Poblacion, Ajuy, Iloilo. In attendance is Dir. Mary Jean B. Padilla, Board of Director, District VI (Ajuy).Pre-membership seminar is one (1) of the requirements for application for electric service. For your information. Read more
Happy birthday HON. ULYSSES L. VALDEZ, Vice Mayor- Barotac Viejo, Iloilo. From ILECO III Family! Read more
Kinahanglan tinlu-an ang mga appliances para ma-preserba ang kapasidad sini. Read more
BIDS AND NOTICES
Procurement of Distribution Transformer Loss Tester Read more
Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Loand, and Maintenance Use Read more