
POWER RATES
POWER ADVISORIES
Pahibalo sa mga katapo-konsumidores nga KANSELADO ang SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila sa ila 50 MVA Transformer #1 sa Panit-an Substation sa MARSO 03, 2024 (DOMINGO). Ang oras kag apektado nga lugar sang sini nga CANCELLED power interruption amo ang masunod: 5:00 AM- 7:00 AM (2 ka Read more
As of 12:30 AM, March 2, 2024 Power was FULLY RESTORED in the entire coverage area of ILECO III. Ajuy S/s Time of Interruption: 6:54 PM, March 1, 2024 Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Time of Interruption: 7:05 PM, March 1, 2024 Feeder 1 – Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substations of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Feeder 1 – ENERGIZED at 11:03 PM Read more
NEWS AND UPDATES
Ang power interruption amo ang temporaryo nga pag-untat sang supply sang kuryente sa isa ka lugar ukon balay. May duha ka sahi sang power interruption: 1. NATALANA (SCHEDULED)2. WALA NATALANA (UNSCHEDULED) Mga rason nga-a may ara sang scheduled power interruption:• Pagkay-o sang makinaryas• Pagkay-o kag pagmentinar sang linya sang kuryente• Line Clearing Activities• Pag-relocate sang Read more
1. Pag-kontrol sang konsumo sang kuryente.2. Pag-gamit sang highly resistive appliances sa tion sang off-peak (kung sa diin barato ang kuryente) ka-angay sang oven, heater, plantsa kag toasters. Likawan ang pag-gamit sang sini nga mga appliances kung peak hours humalin 6:00 PM tubtob 10:00 PM.3. Patyon ang suga sa kwarto kung wala sang tawo.4. Pagsiguro Read more
For complaints regarding power interruptions, please call the Area Offices to report. Thank you and keep safe our beloved MCOs Read more
One (1) of the main topics discussed was the implementation of RA 11552-An Act extending the implementation of the Lifeline Rate to qualified indigent Member Consumers Owners (MCOs). This information education campaign (IEC) is part of ILECO III’s empowerment program of our member-consumer-owners (MCOs) and to be pro-active to all activities conducted by our cooperative.For Read more
BIDS AND NOTICES
Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more