
POWER RATES
POWER ADVISORIES
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substation of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM The following substations are still UNENERGIZED as of reporting Read more
Time of interruption: 6:54 p.m.Estimated time of power restoration: Not yet determinedAffected Areas: Whole coverage area of ILECO III Our Technical Team is currently coordinating with NGCP for the cause of this power interruption which affected the ENTIRE PANAY ISLAND and MOST PARTS of NEGROS ISLAND. The estimated time of power restoration cannot be determined Read more
Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa patigayunon nga clearing activities. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions sa banwa sang BAROTAC VIEJO amo ang masunod: PETSA KAG ORAS APEKTADO NGA LUGARMARSO 11, 2024 (LUNES)8:00 AM- 5:00 PM (9 ka oras ang kalawigon)• Read more
NEWS AND UPDATES
Congratulations to our winners ofLineman, You’re the Man Contest. We would like to commend all the participants who participated in our contest. You are all winners in our hearts. Thank you once again and congratulations! To the winners, please message us in our FB Messenger with your FullName, Address and Contact Number in order for Read more
https://www.facebook.com/watch/live/?ref=watch_permalink&v=627386142826200 Read more
ILECO III conducted a benchmarking activity at Aklan Electric Cooperative, Inc. (AKELCO) on its Complaint Management System, GPS Tracking System for service vehicles and other best practices on August 03, 2023 (Thursday). AKELCO family headed by General Manager, Atty. Ariel B. Gepty, together with their Management Committee warmly welcomed ILECO III to their Main Office Read more
Also in attendance were Ms. Christine Joy G. Hermano, ISD Manager, Mr. Alex A. Demandante, MSD Chief, Mr. Joel C. Datoon, BEA President and other ILECO III and BEA Officers. For your information. Read more
BIDS AND NOTICES
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Procurement of Poles Read more