
POWER RATES
POWER ADVISORIES
Pahibalo sa mga katapo-konsumidores nga KANSELADO ang SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila sa ila 50 MVA Transformer #1 sa Panit-an Substation sa MARSO 03, 2024 (DOMINGO). Ang oras kag apektado nga lugar sang sini nga CANCELLED power interruption amo ang masunod: 5:00 AM- 7:00 AM (2 ka Read more
As of 12:30 AM, March 2, 2024 Power was FULLY RESTORED in the entire coverage area of ILECO III. Ajuy S/s Time of Interruption: 6:54 PM, March 1, 2024 Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Time of Interruption: 7:05 PM, March 1, 2024 Feeder 1 – Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substations of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Feeder 1 – ENERGIZED at 11:03 PM Read more
NEWS AND UPDATES
Avoid overloading of outlets. Read more
ILECO III Board of Directors attending the 54th NEA Founding Anniversary, 2023 NEA-EC Convergence and 14th National Electrification Awareness Month (NEAM) with this year’s theme: “Total Electrification by 2028” in Philippine International Convention Center, Pasay City, Metro Manila on August 09-11, 2023. Read more
TO EXPRESS ILECO III’S GREAT APPRECIATION TO THE EXEMPLARY AND UNWAIVERING DEDICATION OF ILECO III WARRIORS OF LIGHT AND TO ALL THE LINEWORKERS, ILECO III ORGANIZED AND CONDUCTED SERIES OF ACTIVITIES TO GIVE HONOR TO THEIR DEDICATION AT WORK. For the Morning session, a zoom event was conducted to recognize and give honor to all Read more
BIDS AND NOTICES
Design and Integration of ILECO III Mobile Application Read more