
POWER RATES
POWER ADVISORIES
Pahibalo sa mga katapo-konsumidores nga KANSELADO ang SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila sa ila 50 MVA Transformer #1 sa Panit-an Substation sa MARSO 03, 2024 (DOMINGO). Ang oras kag apektado nga lugar sang sini nga CANCELLED power interruption amo ang masunod: 5:00 AM- 7:00 AM (2 ka Read more
As of 12:30 AM, March 2, 2024 Power was FULLY RESTORED in the entire coverage area of ILECO III. Ajuy S/s Time of Interruption: 6:54 PM, March 1, 2024 Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Time of Interruption: 7:05 PM, March 1, 2024 Feeder 1 – Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substations of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Feeder 1 – ENERGIZED at 11:03 PM Read more
NEWS AND UPDATES
Always check your LPG tank for leaks. Read more
https://www.facebook.com/watch/live/?ref=watch_permalink&v=2197748450558855 Read more
BIDS AND NOTICES
Procurement of Materials for Maintenance, Rehabilitation, Revamp of Lines and Capital Expenditure Projects Read more
Procurement of Security Services Requirement of ILECO III Read more
Procurement of Protection and Isolation Equipment Read more