• EMERGENCY POWER INTERRUPTION

    EMERGENCY POWER INTERRUPTION IN NATIVIDAD AREA COVERAGE DUE TO NGCP’s AUTOMATIC LOAD DROPPING DATE: May 23, 2024 (Thursday) TIME OF POWER INTERRUPTION: 4:16 PM Estimated time for power restoration is not specified by NGCP. AFFECTED AREAS: Anilao, Banate, Barotac Viejo & San Rafael REASON: Automatic Load Dropping due to deficiency in supply in the Visayas Read more

  • UPDATE FROM NGCP

    For your information. https://www.facebook.com/NGCPph/posts/pfbid036XTM9viQuwy8zrSwX4bKecvXwrvhug79qZm45ufLfLx2Xk6rYhj3HZWVaBtx5s7Gl Read more

  • GRID ALERT STATUS FROM NGCP AS OF MAY 23, 2024, 9:16 AM

    FOR YOUR INFORMATION. https://www.facebook.com/NGCPph/posts/pfbid02ENeJ9sMDnqejWjdBeg7Ww7pNbnUg4NmGxApv9PzUrqWxY5Q31zo9VE3Zcg8jJadBl Read more

  • HAPPY BIRTHDAY MAYOR VILLEGAS!

    Happy birthday HON. OSCAR C. VILLEGAS, JR., Municipal Mayor- Lemery, Iloilo. From ILECO III Family! Read more

  • LOOK: ILECO III CONDUCTED IEC AND GIFT GIVING ACTIVITY

    ILECO III successfully conducted Information Education Campaign (IEC) and Gift-giving Activity to 44 BAPA members in Sitio Hurog, Jamul-awon, Concepcion, Iloilo on August 25, 2023 (Friday). The said meeting was attended and headed by SAO-Branch Operation Service Chief Mr. Manuel S. Espinosa II, MCO-WD Chief Mr. Alex A. Demandante and assisted by other ILECO III Read more

  • SAFETY TIPS SA PANAHON SANG TAG-ULAN

    1. Patyon ang Main Switch kung nagabaha na sa inyo lugar.2. Indi pagtandugon ang mga basa nga wirings sang kuryente.3. Indi magsaka sa mga kahoy bangud possible nga maglatay ang boltahe sang kuryente sa mga basa nga sanga.4. Pagkatapos mabahaan ang inyo lugar, indi anay pagbuksan ang main switch. Magtawag sang accredited barangay electrician para Read more

  • LOOK: ILECO III CONDUCTED IEC AND GIFT GIVING ACTIVITY

    ILECO III successfully conducted Information Education Campaign (IEC) and Gift-giving Activity to 38 BAPA members in Sitio Linusot, Poblacion, San Rafael, Iloilo on August 23, 2023 (Wednesday). The said meeting was attended and headed by NAO-Branch Operation Service Chief Ms. Ma. Angela P. Resano and assisted by other ILECO III personnel. This is one of Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more