
POWER RATES
POWER ADVISORIES
Ang oras kag apektado nga lugar sang sini nga power interruption amo ang masunod: HUNYO 01, 2024 (SABADO) 4:00 PM- 5:00 PM (1 ka oras ang kalawigon) • SARA • LEMERY • AJUY • CONCEPCION • SAN DIONISIO • ESTANCIA • BATAD • CARLES • BALASAN Ang NGCP ang system operator sang Transmission Line nga Read more
Date: May 29, 2024 (Wednesday) Time of interruption: 9:00 AM Time of restoration: 10:30 AM Affected area: Villa Pani-an, Estancia, Iloilo Activities: Replaced damage transformer and conducted load splitting For your information. Read more
Date: May 29, 2024 Time of interruption: 9:21 AM Estimated time of restoration: 2:00 PM Activity: On-going replacement of two (2) rotten poles and rehabilitation of khwr meters Affected area: Brgy. Moto, San Dionisio, Iloilo For your information. Read more
NEWS AND UPDATES
Pahibalo sa mga katapo konsumidores sang ILECO III nga may ara sang 5% nga diskwento para sa aton mga Senior Citizens nga naga-konsumo sang indi maglapaw sa 100 kwhr kag nakapa-miyembro na sa kooperatiba indi magnubo sa isa ka tuig. Ipasa ang mga masunod nga requirements sa pinakamalapit nga Area Office sang ILECO III:• Valid Read more
One (1) of the main topics discussed was the implementation of RA 11552-An Act extending the implementation of the Lifeline Rate to qualified indigent Member Consumers Owners (MCOs). This information education campaign (IEC) is part of ILECO III’s empowerment program of our member-consumer-owners (MCOs) and to be pro-active to all activities conducted by our cooperative. Read more
Pag-ulikid kag pagpalangga sa aton mga Senior Citizens ang aton gin pangunahan sa paghatag sa ila sang groceries. Kaupod ang aton mga Board of Directors, personal nga nagkadto ang ILECO III sa ila panimalay para mag distribute sang grocery packs. Dako gid ang pagpasalamat kag pagpabutyag sang aton ILECO III Board of Directors, Management and Read more
BIDS AND NOTICES
Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more