POWER RATES
POWER ADVISORIES
As of 12:30 AM, March 2, 2024 Power was FULLY RESTORED in the entire coverage area of ILECO III. Ajuy S/s Time of Interruption: 6:54 PM, March 1, 2024 Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Time of Interruption: 7:05 PM, March 1, 2024 Feeder 1 – Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substations of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Feeder 1 – ENERGIZED at 11:03 PM Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substation of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM The following substations are still UNENERGIZED as of reporting Read more
NEWS AND UPDATES
Avoid overloading of outlets. Read more
Ensure emergency contact information is up-to-date. Read more
Gin selebrar sang ILECO III ang ika 37th Founding Anniversary sa paghalad sang Libre nga Tinapay para sa mga Member-Consumer-Owners (MCOs) nga nagabayad sang ila bills sa aton mga Area Offices. Ang pagsa-ulog sang sini nga selebrasyon nagdalagan sa bilog nga bulan sang Setyembre kag isa ini sa mga aktibidad nga gin-implementar bilang isa ka Read more
BIDS AND NOTICES
Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more