
POWER RATES
POWER ADVISORIES
As of 12:30 AM, March 2, 2024 Power was FULLY RESTORED in the entire coverage area of ILECO III. Ajuy S/s Time of Interruption: 6:54 PM, March 1, 2024 Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Time of Interruption: 7:05 PM, March 1, 2024 Feeder 1 – Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substations of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Feeder 1 – ENERGIZED at 11:03 PM Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substation of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM The following substations are still UNENERGIZED as of reporting Read more
NEWS AND UPDATES
APRIL 12, 2025 (SATURDAY), 9:00 AM • ILECO III Gymnasium, Brgy. Preciosa, Sara, Iloilo • Balasan Civic Center, Brgy. Poblacion Sur, Balasan, Iloilo • Barotac Viejo Municipal Gymnasium, Brgy. Poblacion, Barotac Viejo, Iloilo “Beyond Power: Electric Cooperatives Empowering Communities, Changing Lives” Read more
APRIL 12, 2025 (SATURDAY), 9:00 AM • ILECO III Gymnasium, Brgy. Preciosa, Sara, Iloilo • Balasan Civic Center, Brgy. Poblacion Sur, Balasan, Iloilo • Barotac Viejo Municipal Gymnasium, Brgy. Poblacion, Barotac Viejo, Iloilo “Beyond Power: Electric Cooperatives Empowering Communities, Changing Lives” Read more
From ILECO III Family! Read more
“Sa pag-iwas sa Sunog, Hindi Ka Nag-iisa” As part of Fire Prevention Month and to ensure the safety of our employees and security personnel, ILECO III conducted a Fire Prevention Seminar and Fire Drill to raise awareness of fire hazards in the workplace. These initiatives were designed to enhance fire safety awareness and preparedness among Read more
BIDS AND NOTICES
Refurbishment of Roofing, Glass Counters and Repainting of Sara Area Office. Read more
Procurement and Supply of Six (6) Units Service Vehicle for Maintenance Use in Area Offices. Read more
Procurement of Materials for Maintenance, Rehabilitation, Revamp of Lines and Capital Expenditures Read more