• SCHEDULED POWER INTERRUPTION SA OKTUBRE 1, 2022 SA BANWA SANG BANATE

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa Oktubre 01, 2022 (Sabado), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon para sa pag-ubra sang Double Circuit line halin sa Poblacion, Banate pakadto sa Carmelo, Banate para sa ginpatigayon nga on-going Banate Substation. Ang apektado nga lugar sang sini nga… Read more

  • UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 27, 2022)

    Date: September 27, 2022 Time of interruption: 10:20 AM Time of restoration: 10:50 AM Affected area: Poblacion, Ajuy, Iloilo Activity: Retirement of distribution transformer We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 22, 2022)

    Date: September 22, 2022 Time of interruption: 5:35 AM Time of Restoration: 6:16 AM Affected Area: Brgy. Zaragosa, Balasan Activity: Inspection of line and replaced fuselink We apologize for the inconvenience. For your information. Read more

  • FIRE SAFETY TIP

    Keep your home clean at all times. Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION– Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION– Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa… Read more

  • 14 DAYS TO GO BEFORE CHRISTMAS!

    Read more

  • ILECO 3 JOINS THE NATIONAL CONSCIOUSNESS MONTH 2023

    ILOILO III ELECTRIC COOPERATIVE, INC. joins the National Consciousness Month 2023 with the theme, Sustainable and Responsible Energy Future: Fueling Hope, Lighting the Way. We should embrace the power of awareness this Energy Consciousness Month. Small changes in energy use lead to big impacts on our planet. Let’s illuminate a sustainable path forward together. #ILECO3ThisEnergyConsciousnessMonth#GreenerFuture#BrighterFutureForGenerationsToCome Read more

  • ITB 2404, S. 2024

    Refurbishment of Roofing, Glass Counters and Repainting of Sara Area Office. Read more

  • ITB 2403, S. 2024

    Procurement and Supply of Six (6) Units Service Vehicle for Maintenance Use in Area Offices. Read more

  • ITB 2402, S. 2024

    Procurement of Materials for Maintenance, Rehabilitation, Revamp of Lines and Capital Expenditures Read more