• SCHEDULED POWER INTERRUPTION SA BANWA SANG AJUY SA HUNYO 27, 2024

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa HUNYO 27, 2024 (HUWEBES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa pag-convert sang open secondary line to single phase line kag pag-construct sang tapping pole. Ang lugar nga apektado sang sini nga power interruption sa banwa sang AJUY Read more

  • NGCP UNSCHEDULED POWER INTERRUPTION

    What: NGCP UNSCHEDULED POWER INTERRUPTION Time of power interruption: 7:38 p.m. Time of power restoration: 7:53 p.m. Affected areas: Municipalities of Anilao, Banate, Barotac Viejo and San Rafael Our Technical Team is currently in coordination with the National Grid Corporation of the Philippines (NGCP) for the cause of the said power interruption. Thank you for Read more

  • SCHEDULED POWER INTERRUPTION sang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila AJUY, SARA, BALASAN kag ESTANCIA sa HUNYO 25, 2024

    Pahibalo sa mga katapo-konsumidores nga may patigayunon nga SCHEDULED POWER INTERRUPTION ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila AJUY, SARA, BALASAN kag ESTANCIA 69 kV Line sa HUNYO 25, 2024 (MARTES). Ang oras kag apektado nga lugar sang sini nga power interruption amo ang masunod: PETSA KAG ORAS APEKTADO NGA LUGAR 4:30 Read more

  • FIRE SAFETY TIP

    Keep your home clean at all times. Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION– Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION– Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa Read more

  • 14 DAYS TO GO BEFORE CHRISTMAS!

    Read more

  • ILECO 3 JOINS THE NATIONAL CONSCIOUSNESS MONTH 2023

    ILOILO III ELECTRIC COOPERATIVE, INC. joins the National Consciousness Month 2023 with the theme, Sustainable and Responsible Energy Future: Fueling Hope, Lighting the Way. We should embrace the power of awareness this Energy Consciousness Month. Small changes in energy use lead to big impacts on our planet. Let’s illuminate a sustainable path forward together. #ILECO3ThisEnergyConsciousnessMonth#GreenerFuture#BrighterFutureForGenerationsToCome Read more

  • ITB 2407, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Five (5) Barangays (Brgy. Barangcalan, Brgy. Bito-on, Brgy. Talingting, Brgy. Tinigban, and Brgy. Punta Batuanan) in Calagnaan Island, Carles, Iloilo (Turn Key) Read more

  • ITB 2406, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials from Brgy. Poblacion to Brgy. Daculan, Estancia and Brgy. Manlot, Manlot Island, Carles, Iloilo(Turn Key) Read more

  • ITB 2405, S. 2024

    Invitation to Bid for the Design, Supply, Delivery, Installation, Testing and Commissioning of Three-Phase Submarine Line Cable from Brgy. Daculan, Estancia to Brgy. Manlot, Carles, from Brgy. Manlot to Brgy. Talingting, Carles and from Brgy. Punta Batuanan to Brgy. San Fernando, Carles, Iloilo (Turn Key) Read more