• EMERGENCY POWER INTERRUPTION

    Date: November 21, 2024 (Thursday) Time of interruption: 12:00 MIDNIGHT Estimated time of restoration: 1:00 AM Duration: 1 hour Affected area: Natividad Substation (Feeders 1-3) Reason: To facilitate hot spot correction at surge arrester installed in 10MVA Natividad Substation Power Transformer For your information. Read more

  • SCHEDULED POWER INTERRUPTION SA BANWA SANG BALASAN, CARLES, BATAD, KAG ESTANCIA SA NOBYEMBRE 23, 2024

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa NOBYEMBRE 23, 2024 (SABADO) para sa pag-ilis kag pag-relocate sang poste kag clearing sang linya. Ang petsa, oras kag lugar nga apektado sang sini nga power interruption amo ang masunod: 7:00 AM- 5:00 PM (10 ka oras ang kalawigon) • Bilog nga Read more

  • SCHEDULED POWER INTERRUPTION SA BANWA SANG SAN DIONISIO SA NOBYEMBRE 26, 2024

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa NOBYEMBRE 26, 2024 (MARTES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa pag-ilis sang poste kag pag construct sang linya. Ang lugar nga apektado sang sini nga power interruption sa banwa sang SAN DIONISIO amo ang: • Rizal St., Read more

  • FIRE SAFETY TIP

    Keep your home clean at all times. Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION– Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION– Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa Read more

  • 14 DAYS TO GO BEFORE CHRISTMAS!

    Read more

  • ILECO 3 JOINS THE NATIONAL CONSCIOUSNESS MONTH 2023

    ILOILO III ELECTRIC COOPERATIVE, INC. joins the National Consciousness Month 2023 with the theme, Sustainable and Responsible Energy Future: Fueling Hope, Lighting the Way. We should embrace the power of awareness this Energy Consciousness Month. Small changes in energy use lead to big impacts on our planet. Let’s illuminate a sustainable path forward together. #ILECO3ThisEnergyConsciousnessMonth#GreenerFuture#BrighterFutureForGenerationsToCome Read more

  • ITB 2407, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Five (5) Barangays (Brgy. Barangcalan, Brgy. Bito-on, Brgy. Talingting, Brgy. Tinigban, and Brgy. Punta Batuanan) in Calagnaan Island, Carles, Iloilo (Turn Key) Read more

  • ITB 2406, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials from Brgy. Poblacion to Brgy. Daculan, Estancia and Brgy. Manlot, Manlot Island, Carles, Iloilo(Turn Key) Read more

  • ITB 2405, S. 2024

    Invitation to Bid for the Design, Supply, Delivery, Installation, Testing and Commissioning of Three-Phase Submarine Line Cable from Brgy. Daculan, Estancia to Brgy. Manlot, Carles, from Brgy. Manlot to Brgy. Talingting, Carles and from Brgy. Punta Batuanan to Brgy. San Fernando, Carles, Iloilo (Turn Key) Read more