• UNSCHEDULED POWER INTERRUPTION (MAY 7, 2022)

    Date: May 07, 2022 (Saturday) Time of interruption: 2:00 AM Time of restoration: 2:40 AM Affected area: Pantalan, Camiros and Balabag, Anilao, Iloilo Activities: Inspection of line and refusing center phase trip-off We apologize for the inconvenience. For your information. Read more

  • EMERGENCY POWER INTERRUPTION (MAY 7, 2022)

    DATE: MAY 07, 2022 (SATURDAY) Time of interruption: 7:00 AM Estimated time of restoration: 12:00 NN Affected barangays: Pedada and Bay-ang, Ajuy, Iloilo Activity: To relocate pole We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (MAY 6, 2022)

    Date: May 6, 2022 (Friday) Time of interruption: 5:10 AM Time of restoartion: 8:30 AM Affected area: Blue Horizon Farm in Brgy. Natividad, Barotac Viejo, Iloilo Activity: Replaced damaged lightning arrester and refusing private transformer We apologize for the inconvenience. For your information. Read more

  • ILECO III ENERGY SAVING TIPS

    1. Pag-kontrol sang konsumo sang kuryente.2. Pag-gamit sang highly resistive appliances sa tion sang off-peak (kung sa diin barato ang kuryente) ka-angay sang oven, heater, plantsa kag toasters. Likawan ang pag-gamit sang sini nga mga appliances kung peak hours humalin 6:00 PM tubtob 10:00 PM.3. Patyon ang suga sa kwarto kung wala sang tawo.4. Pagsiguro… Read more

  • FIRE SAFETY TIP

    Keep your home clean at all times. Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION– Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION– Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa… Read more

  • 14 DAYS TO GO BEFORE CHRISTMAS!

    Read more

  • ITB 2501, S. 2025

    Read more

  • ITB 2409, S. 2024

    Invitation to Bid for the Supply and Delivery of kWHr Meters, 5(100) A, Electronic, Single Phase, Bottom Connected (6,434 units) Read more

  • ITB 2408, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Three (3) Brgys. (Brgy. Buaya, Brgy. Alipata, and Brgy. San Fernando) in Sicogon Island, Carles, Iloilo (Turn Key) Read more