• ILECO III UNSCHEDULED POWER INTERRUPTION (MAY 22, 2022)

    Time of interruption: 8:15 PM Time restored: 9:20 PM Affected area: Feeder 2 of Natividad S/S Anilao and Banate Reason : Line fault due to the exposure of branch of tree on the primary line located at Hilltop, Brgy. Belen, Banate Thank you for your patience and understanding. Read more

  • ILECO III UNSCHEDULED POWER INTERRUPTION (MAY 22, 2022)

    Time of interruption: 5:56 PM Time restored: 6:33 PM Affected area: P.4 Tacbuyan Estancia Activity: Repair of neutral secondary bushing cut- off Thank you for your patience and understanding. Read more

  • SCHEDULED POWER INTERRUPTION SA MAYO 25, 2022

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa MAYO 25, 2022 (MIYERKULES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa patigayunon nga clearing sang linya. Ang lugar nga apektado sang sini nga power interruption sa CONCEPCION amo ang masunod:MacalbangTamis-acNinoPlandico Madamo gid nga salamat sa inyo nga paghangop… Read more

  • ILECO III ENERGY SAVING TIPS

    1. Pag-kontrol sang konsumo sang kuryente.2. Pag-gamit sang highly resistive appliances sa tion sang off-peak (kung sa diin barato ang kuryente) ka-angay sang oven, heater, plantsa kag toasters. Likawan ang pag-gamit sang sini nga mga appliances kung peak hours humalin 6:00 PM tubtob 10:00 PM.3. Patyon ang suga sa kwarto kung wala sang tawo.4. Pagsiguro… Read more

  • FIRE SAFETY TIP

    Keep your home clean at all times. Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION– Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION– Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa… Read more

  • 14 DAYS TO GO BEFORE CHRISTMAS!

    Read more

  • ITB 2501, S. 2025

    Read more

  • ITB 2409, S. 2024

    Invitation to Bid for the Supply and Delivery of kWHr Meters, 5(100) A, Electronic, Single Phase, Bottom Connected (6,434 units) Read more

  • ITB 2408, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Three (3) Brgys. (Brgy. Buaya, Brgy. Alipata, and Brgy. San Fernando) in Sicogon Island, Carles, Iloilo (Turn Key) Read more