• UNSCHEDULED POWER INTERRUPTION (MAY 17, 2022)

    Date: May 17, 2022 (Tuesday) Time of interruption: 10:25 AM Time of restoration: 11:32 Affected area: Sitio Toll House, San Lucas, Barotac Viejo Activities: Load splitting and uprating of distribution transformer We apologize for the inconvenience. For your information. Read more

  • SCHEDULED POWER INTERRUPTION SA MAYO 21, 2022

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa MAYO 21, 2022 (SABADO), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa patigayunon nga clearing sang linya. Ang lugar nga apektado sang sini nga power interruption sa Sara amo ang masunod: AguirreAntonio Yusay/PasigAposagaArdemilBatoDel CastilloDomingoJuanezaLatawanMalapayaMuycoTady Madamo gid nga salamat sa… Read more

  • REPLACEMENT OF DEFECTIVE METERS IN BRGY. TARONG, CARLES

    ILECO III Technical Team conducted replacement of defective meters in Brgy. Tarong, Carles, Iloilo and Purok 4, Mamhut Sur, Balasan, Iloilo today, May 16, 2022 (Monday). For your information. Read more

  • ILECO III ENERGY SAVING TIPS

    1. Pag-kontrol sang konsumo sang kuryente.2. Pag-gamit sang highly resistive appliances sa tion sang off-peak (kung sa diin barato ang kuryente) ka-angay sang oven, heater, plantsa kag toasters. Likawan ang pag-gamit sang sini nga mga appliances kung peak hours humalin 6:00 PM tubtob 10:00 PM.3. Patyon ang suga sa kwarto kung wala sang tawo.4. Pagsiguro… Read more

  • FIRE SAFETY TIP

    Keep your home clean at all times. Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION– Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION– Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa… Read more

  • 14 DAYS TO GO BEFORE CHRISTMAS!

    Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more