• UNSCHDEULED POWER INTERRUPTION (JUNE 16, 2022)

    Date: June 16, 2022 Time of interruption: 9:40 AM Time of restoration: 12:00 NN Affected area: DB Onate St., Poblacion, Concepcion, Iloilo Activities: Replacement of rotten pole and rehab of kwhr maters We apologize for the inconvenience. For your information. Read more

  • SCHEDULED POWER INTERRUPTION SA HUNYO 20-24, 27-30 KAG HULYO 1, 2022 SA BANWA SANG LEMERY

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III magaumpisa ini alas 9:00 AM- 4:00 PM (7 ka oras ang kalawigon) para sa pag-clearing sang linya. Ang petsa kag lugar nga apektado sang sini nga power interruption amo ang masunod: PETSA APEKTADO NGA BARANGAY Hunyo 20, 2022 CapiƱahan, LemeryHunyo 21, 2022 Cabantohan,… Read more

  • UNSCHEDULED POWER INTERRUPTION (JUNE 15, 2022)

    Date: June 15, 2022 Time of interruption: 11:30 AM Time of restoration: 12:40 PM Affected areas: Batuan and Amayong, San Dionisio, Iloilo Activity: Replacement of busted transformer We apologize for the inconvenience. For your information. Read more

  • ILECO III ENERGY SAVING TIPS

    1. Pag-kontrol sang konsumo sang kuryente.2. Pag-gamit sang highly resistive appliances sa tion sang off-peak (kung sa diin barato ang kuryente) ka-angay sang oven, heater, plantsa kag toasters. Likawan ang pag-gamit sang sini nga mga appliances kung peak hours humalin 6:00 PM tubtob 10:00 PM.3. Patyon ang suga sa kwarto kung wala sang tawo.4. Pagsiguro… Read more

  • FIRE SAFETY TIP

    Keep your home clean at all times. Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION– Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION– Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa… Read more

  • 14 DAYS TO GO BEFORE CHRISTMAS!

    Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more