• UNSCHEDULED POWER INTERRUPTION (JANUARY 26, 2024)

    Date: January 26, 2024 Time of interruption: 7:30 AM Time of power restoration: 9:21 AM Affected areas: Purok 1, Tarong, Carles Activity: Inspection and clearing of line due to vegetation For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (JANUARY 26, 2024)

    Date: January 26, 2024 Time of interruption: 7:45 AM Time of power restoration: 10:28 AM Affected areas: Sitio Nangka, Bancal, Carles Activity: Inspection of line and replaced busted fuse link For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (JANUARY 26, 2024)

    Date: January 26, 2024 Time of interruption: 7:15 AM Time of power restoration: 8:28 AM Affected areas: Purok 5, Mamhut Sur, Balasan Activity: Inspection of secondary line and replaced busted fuselink. For your information. Read more

  • FIRE SAFETY TIP

    Keep your home clean at all times. Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION– Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION– Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa Read more

  • 14 DAYS TO GO BEFORE CHRISTMAS!

    Read more

  • ILECO 3 JOINS THE NATIONAL CONSCIOUSNESS MONTH 2023

    ILOILO III ELECTRIC COOPERATIVE, INC. joins the National Consciousness Month 2023 with the theme, Sustainable and Responsible Energy Future: Fueling Hope, Lighting the Way. We should embrace the power of awareness this Energy Consciousness Month. Small changes in energy use lead to big impacts on our planet. Let’s illuminate a sustainable path forward together. #ILECO3ThisEnergyConsciousnessMonth#GreenerFuture#BrighterFutureForGenerationsToCome Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more