• UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 13, 2022)

    Date: September 13, 2022 Time of interruption: 3:35 PM Time of Restoration: 4:45 PM Affected Area: Area from Dugman – Canas, San Dionisio Activity: Inspection of line and replaced fuselink We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 13, 2022)

    Date: September 13, 2022 Time of interruption: 3:35 PM Time of Restoration: 4:56 PM Affected Area: Sitio Lampuyang and Sitio Danmar, Sitio Puros and Sitio Baculod, Libertad, Banate Activity: Inspection and clearing of lines due to vegetation. We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 12, 2022)

    Date: September 12, 2022 Time of interruption: 9:38 AM Time of Restoration: 5:00 PM Affected Area: Brgy. Moto, San Dionisio Activity: Replacement and relocation of rotten poles (2) structure. Installation and rehabilitation of SDI and kWhr Meter in cooperation with our third party contractor (NIGSECO). We apologize for the inconvenience. For your information. Read more

  • FIRE SAFETY TIP

    Keep your home clean at all times. Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION– Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION– Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa… Read more

  • 14 DAYS TO GO BEFORE CHRISTMAS!

    Read more

  • ILECO 3 JOINS THE NATIONAL CONSCIOUSNESS MONTH 2023

    ILOILO III ELECTRIC COOPERATIVE, INC. joins the National Consciousness Month 2023 with the theme, Sustainable and Responsible Energy Future: Fueling Hope, Lighting the Way. We should embrace the power of awareness this Energy Consciousness Month. Small changes in energy use lead to big impacts on our planet. Let’s illuminate a sustainable path forward together. #ILECO3ThisEnergyConsciousnessMonth#GreenerFuture#BrighterFutureForGenerationsToCome Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more