• RESCHEDULED POWER INTERRUPTION

    Pahibalo sa mga katapo-konsumidores nga ang PREVENTIVE MAINTENANCE sang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila Dingle-Natividad 69kV Line sa HUNYO 03, 2023 (SABADO) ang GIN-RESCHEDULE sa HUNYO 04, 2023 (DOMINGO). Ang oras kag apektado nga lugar sang sini power interruption amo ang masunod: HUNYO 04, 2023 (DOMINGO)6:00 AM- 6:00 PM (12 ka Read more

  • KANSELADO ANG ANNUAL PREVENTIVE MAINTENANCE SANG NGCP SA HUNYO 4, 2023

    Pahibalo sa mga katapo-konsumidores nga KANSELADO ang LOAD TRANSFER kag ANNUAL PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila Panit-an 138/69kV 50MVA Transformer sa HUNYO 04, 2023 (DOMINGO). Ang oras kag apektado nga lugar sang KANSELADO nga power interruption amo ang masunod: 5:00 AM- 7:00 AM (2 ka oras ang kalawigon)KAG4:00 Read more

  • ILECO III POWER ADVISORY: UNSCHEDULED POWER INTERRUPTION

    AS OF 4:30 PM, MAY 31, 2023 CAUSE: HEAVY RAIN AFFECTED SUBSTATION: SARA SUBSTATION FOR YOUR INFORMATION AND REFERENCE. Read more

  • FIRE SAFETY TIP

    Keep your home clean at all times. Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION– Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION– Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa Read more

  • 14 DAYS TO GO BEFORE CHRISTMAS!

    Read more

  • ILECO 3 JOINS THE NATIONAL CONSCIOUSNESS MONTH 2023

    ILOILO III ELECTRIC COOPERATIVE, INC. joins the National Consciousness Month 2023 with the theme, Sustainable and Responsible Energy Future: Fueling Hope, Lighting the Way. We should embrace the power of awareness this Energy Consciousness Month. Small changes in energy use lead to big impacts on our planet. Let’s illuminate a sustainable path forward together. #ILECO3ThisEnergyConsciousnessMonth#GreenerFuture#BrighterFutureForGenerationsToCome Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more