• MAY SCHEDULED PREVENTIVE MAINTENANCE KAG LOAD TRANSFER ANG NGCP SA HULYO 15, 2023

    Pahibalo sa mga katapo-konsumidores nga may patigayunon nga SCHEDULED PREVENTIVE MAINTENANCE kag LOAD TRANSFER ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 69 kV Sara-Estancia Transmission Line Section sa HULYO 15, 2023 (SABADO). Ang oras kag apektado nga lugar sang sini power interruption amo ang masunod: 5:00 AM- 6:00 PM (13 ka oras Read more

  • NGCP’s UNSCHEDULED POWER INTERRUPTION

    DATE: July 06, 2023 (Thursday) Time of interruption:Ajuy S/s: 9:00PMSara S/s: 9:00 PMPani-an S/s: 9:01 PMDaan Banwa S/s: 9:00 PM Estimated Time of power restoration: Sara S/s: 9:10 PMAjuy S/s: 9:08 PMPani-an S/s: 9:13 PMDaan Banwa S/s: 9:15 PM Affected areas: Whole coverage of ILECO III Cause of interruption: UNDER INVESTIGATION Our technical team is Read more

  • NGCP’s UNSCHEDULED POWER INTERRUPTION (UPDATE)

    DATE: July 05, 2023 (Wednesday) Time of interruption:Barotac Viejo S/s: 8:50 PMBanate S/s: 8:50 PM Estimated Time of power restoration: Barotac Viejo S/s : 9:05 PMBanate S/s: 9:06 PM Affected areas: Anilao, Banate, Barotac Viejo and San Rafael Cause of interruption: UNDER INVESTIGATION Our technical team is closely coordinating with NGCP regarding the cause of Read more

  • FIRE SAFETY TIP

    Keep your home clean at all times. Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION– Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION– Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa Read more

  • 14 DAYS TO GO BEFORE CHRISTMAS!

    Read more

  • ILECO 3 JOINS THE NATIONAL CONSCIOUSNESS MONTH 2023

    ILOILO III ELECTRIC COOPERATIVE, INC. joins the National Consciousness Month 2023 with the theme, Sustainable and Responsible Energy Future: Fueling Hope, Lighting the Way. We should embrace the power of awareness this Energy Consciousness Month. Small changes in energy use lead to big impacts on our planet. Let’s illuminate a sustainable path forward together. #ILECO3ThisEnergyConsciousnessMonth#GreenerFuture#BrighterFutureForGenerationsToCome Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more