• UNSCHEDULED POWER INTERRUPTION (NOVEMBER 9, 2023)

    Date: November 9, 2023 (Thursday) Time of interruption: 7:12 PM Estimated time of restoration: 7:35 PM Affected area/s: Sitio Waling-Waling, Poblacion and Brgy. Barosbos, Carles Activity: Inspection and replaced busted fuse link of Phase C Line. We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (NOVEMBER 8, 2023)

    Date: November 8, 2023 (Wednesday) Time of interruption: 11:10 AM Estimated time of restoration: 1:25 PM Affected area/s: Proper, Brgy. Bagacay, San Rafael Activity: Inspection and replaced damaged transformer We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (NOVEMBER 8, 2023)

    Date: November 8, 2023 (Wednesday) Time of interruption: 7:44 AM Estimated time of restoration: 8:50 AM Affected area/s: Brgy. Dapdapan and Cabantohan, Lemery Activity: Inspection/repaired sectionalizing cut-out of Phase C located at Brgy. Arante and replaced busted fuse link due to heavy rain and lightning surge We apologize for the inconvenience. For your information. Read more

  • FIRE SAFETY TIP

    Keep your home clean at all times. Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION– Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION– Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa Read more

  • 14 DAYS TO GO BEFORE CHRISTMAS!

    Read more

  • ILECO 3 JOINS THE NATIONAL CONSCIOUSNESS MONTH 2023

    ILOILO III ELECTRIC COOPERATIVE, INC. joins the National Consciousness Month 2023 with the theme, Sustainable and Responsible Energy Future: Fueling Hope, Lighting the Way. We should embrace the power of awareness this Energy Consciousness Month. Small changes in energy use lead to big impacts on our planet. Let’s illuminate a sustainable path forward together. #ILECO3ThisEnergyConsciousnessMonth#GreenerFuture#BrighterFutureForGenerationsToCome Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more