• UNSCHEDULED POWER INTERRUPTION (NOVEMBER 12, 2023)

    Date: November 12, 2023 (Sunday) Time of interruption: 2:45 PM Time of restoration: 3:20 PM Affected area/s: Banaria St., and portion of Lopez Jaena St., Poblacion, Barotac Viejo Activity: Repair of neutral bushing We apologize for the inconvenience. Thank you for your usual understanding. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (NOVEMBER 11, 2023)

    Date: November 11, 2023 (Saturday) Time of interruption: 6:23 p.m. Estimated time of restoration: 11:00 p.m. Affected area/s: Municipalities of Balasan and Carles, and portion of Estancia Cause of power interruption: Line fault in primary distribution line Our maintenance team is currently troubleshooting the damaged primary distribution line for the power to be restored. We Read more

  • SCHEDULED POWER INTERRUPTION SA NOBYEMBRE 15, 2023

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa NOBYEMBRE 15, 2023 (MIYERKULES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa pag relocate sang Single-Phase Line sa Brgy. Pasayan, Batad. Ang lugar nga apektado sang sini nga power interruption amo ang Brgy. Pasayan, Batad. Madamo gid nga salamat Read more

  • FIRE SAFETY TIP

    Keep your home clean at all times. Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION– Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION– Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa Read more

  • 14 DAYS TO GO BEFORE CHRISTMAS!

    Read more

  • ILECO 3 JOINS THE NATIONAL CONSCIOUSNESS MONTH 2023

    ILOILO III ELECTRIC COOPERATIVE, INC. joins the National Consciousness Month 2023 with the theme, Sustainable and Responsible Energy Future: Fueling Hope, Lighting the Way. We should embrace the power of awareness this Energy Consciousness Month. Small changes in energy use lead to big impacts on our planet. Let’s illuminate a sustainable path forward together. #ILECO3ThisEnergyConsciousnessMonth#GreenerFuture#BrighterFutureForGenerationsToCome Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more