• UNSCHEDULED POWER INTERRUPTION (AUGUST 18, 2023)

    Date: August 18, 2023 (Friday) Time of interruption: 1:15 PM Time of restoration: 1:48 PM Affected areas: Sitio Vencer, Sto. Tomas, Barotac Viejo Action Taken: Inspection of line and replaced busted fuse link.2 We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (AUGUST 18, 2023)

    Date: August 18, 2023 (Friday) Time of interruption: 9:44 AM Time of restoration: 10:15 AM Affected areas: Portion of Punta, Carles Action Taken: Pull-out rented transformer and repair damaged secondary bushing of distribution transformer. We apologize for the inconvenience. For your information. Read more

  • SCHEDULED POWER INTERRUPTION SA BANWA SANG BANATE SA AGOSTO 25 KAG 30, 2023

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa patigayunon nga technical activities. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions sa banwa sang BANATE amo ang masunod: AGOSTO 25, 2023 (BIYERNES)8:00 AM- 5:00 PM (9 ka oras ang kalawigon) KAG AGOSTO 30, 2023 (MIYERKULES)8:00 AM- Read more

  • FIRE SAFETY TIP

    Keep your home clean at all times. Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION– Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION– Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa Read more

  • 14 DAYS TO GO BEFORE CHRISTMAS!

    Read more

  • ILECO 3 JOINS THE NATIONAL CONSCIOUSNESS MONTH 2023

    ILOILO III ELECTRIC COOPERATIVE, INC. joins the National Consciousness Month 2023 with the theme, Sustainable and Responsible Energy Future: Fueling Hope, Lighting the Way. We should embrace the power of awareness this Energy Consciousness Month. Small changes in energy use lead to big impacts on our planet. Let’s illuminate a sustainable path forward together. #ILECO3ThisEnergyConsciousnessMonth#GreenerFuture#BrighterFutureForGenerationsToCome Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more