
POWER RATES
POWER ADVISORIES
As of 12:30 AM, March 2, 2024 Power was FULLY RESTORED in the entire coverage area of ILECO III. Ajuy S/s Time of Interruption: 6:54 PM, March 1, 2024 Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Time of Interruption: 7:05 PM, March 1, 2024 Feeder 1 – Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substations of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Feeder 1 – ENERGIZED at 11:03 PM Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substation of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM The following substations are still UNENERGIZED as of reporting Read more
NEWS AND UPDATES
Pahibalo sa mga katapo-konsumidores nga ang DISYEMBRE 18, 2023 (LUNES), ang gin-deklara nga SPECIAL PUBLIC HOLIDAY sa ILOILO CITY kag ILOILO PROVINCE, para sa pag-obserba sang “GRACIANO LOPEZ JAENA” base sa Proclamation No. 319 S. 2023. Bangud sini, SARADO ang ILECO III Main Office kaupod ang Area Office (Sara, Natividad) apang BUKAS naman ang Pani-an Read more
1. Pag-kontrol sang konsumo sang kuryente.2. Pag-gamit sang highly resistive appliances sa tion sang off-peak (kung sa diin barato ang kuryente) ka-angay sang oven, heater, plantsa kag toasters. Likawan ang pag-gamit sang sini nga mga appliances kung peak hours humalin 6:00 PM tubtob 10:00 PM.3. Patyon ang suga sa kwarto kung wala sang tawo.4. Pagsiguro Read more
BIDS AND NOTICES
Improvements of the Distribution Line in Natividad Feeder 3 & Pani-an Feeder 2 Read more
Disposal of Non-Performing Assets Read more
Procurement of Boom Truck for Maintenance Use Read more